A+ A A-
11-30-2013

NEPS-RJA-001

Rate this item
(2 votes)
That's 2 pick-ups done. That's 2 pick-ups done.

In this scenario you are tasked with building a load of empties.

All the work is in Buena Park.

Some go on the front of the loco, and some on the rear.

When the load is built, take it up to LA Mirada Yard.

Your power is BNSF SW1500 #3464

Additional Info

  • Version: 1
  • Designer: Bob Artim
  • Route: Pacific Surfliner
  • Duration: 50 minutes
  • Start time: 09:00
  • Season: Fall
  • Weather: Cloudy
  • Engine assigned: SW1500
  • Class of Work Order: Freight
  • Type of Work Order: Switching
  • Release Date: Saturday, 30 November 2013
  • Requires Payware: No
  • File Size: 539kb
Last modified on November 30, 2013, 6:59 am
More in this category: NEPS-JMcE-001a »
HOT NEWS

Visitors Counter

4084602
Today
This week
This month
Last month
1793
27612
70410
77098

Your IP: 35.153.73.72

blue green orange red

Copyright 2012-2014 by Mutagenix - A subsidiary of the NERR Network. Best viewed at 1280 x or more.