A+ A A-
12-23-2013

NEBQ-KH-004

Rate this item
(1 Vote)

A medium difficult yard switching scenario with a NS theme. Final part 4 of a series of scenarios covering an entire eight hour shift.

After your return from the ethanol plant, you must now take care of all the outbound cars scattered all over the yard.
You will have to assemble two new trains. The first one will consist of the tankcars and crate flatcars on siding 3, in between which you must couple the empty gondolas from the scrap yard spur.
The second train will consist of the ballast hoppers on siding 1, to which you will add the last five cement hoppers from siding 4.
Finally, you must get all the cabooses from the yard consists over to the BQR Engine Track, where the other caboose is still waiting.

Additional Info

  • Version: 1
  • Designer: Keith Hobson
  • Route: Bay of Quinte
  • Duration: 60 minutes
  • Start time: 13:42
  • Season: Summer
  • Weather: Clear
  • Engine assigned: SD40-2
  • Class of Work Order: Freight
  • Type of Work Order: Switching
  • Release Date: Monday, 23 December 2013
  • Requires Payware: No
  • File Size: 80kb
Last modified on December 24, 2013, 3:56 am
More in this category: « NEBQ-KH-003 NEBQ-HRA-001 »
HOT NEWS

Visitors Counter

2187327
Today
This week
This month
Last month
2162
7259
67535
80087

Your IP: 54.198.2.110

blue green orange red

Copyright 2012-2014 by Mutagenix - A subsidiary of the NERR Network. Best viewed at 1280 x or more.